OUTDOOR-RATED, ON & OFF GRID
COMMERCIAL ENERGY STORAGE
Power that works as hard as you.
Whether you’re running a farm, a business, an off-grid property or a high-demand home, Dingo delivers dependable power when it matters most.
Engineered in Australia for harsh Australian conditions.
You can unlock more usable power with RedEarth’s containerised commercial battery storage.
PROVEN IN THE FIELD
Built for Australia’s energy challenges.
Imported BESS products can be excellent at storing energy, but Australian projects often demand much more than that.
Dingo has been engineered to meet everyday Australian energy challenges, from weak or constrained grids, unreliable connections, diesel reliance, remote off-grid sites,and complex hybrid applications.
Dingo was developed by a team that has been solving these challenges for more than 13 years.
Dingo combines battery storage, solar, backup and intelligent energy management in a single platform, giving installers a solution for the projects that don’t fit a simple grid-connected BESS model.
EASY TO INSTALL
Designed to make installation easier
RedEarth doesn’t just ship hardware, we offer engineering support, single-line diagram services, PV array design assistance, commissioning support and installer training to help you deliver projects successfully.
Less time on site
More confidence
- Pre-engineered solution
- Integrated inverter
- Battery cabinet
- Solar MPPTs built-in
- AC combiner option
- Generator integration
- Factory tested
- Australian support
- Monitoring app
- Engineering assistance
- Remote commissioning
- Training available
- Documentation
- Local warranty
Power your resort apartment complex cattle station outback farm mining camp hospital
CASE STUDY
How a Yarra Valley property cut grid reliance by storing excess solar
A Yarra Valley property with a 100 kW solar farm was exporting 200–300 kWh of excess solar each day while relying heavily on the grid to power its large home and farming operations.
ProFX installed a 50 kW/240 kWh RedEarth Dingo battery system to capture that surplus energy and use it overnight, reducing the property’s grid electricity consumption by around 50%.
The system has also lowered operating costs, maximised the value of the existing solar investment and provides scalable capacity for future energy needs.
Project Snapshot
Installer: ProFX and Atrix Electrical
Project: Large residential estate and farm, Yarra Valley, Victoria
System: 50kW inverter with 240kWh RedEarth Dingo battery energy storage system (BESS), integrated with an existing 100kW solar farm
Commissioned: 2026
Challenge: Capture excess solar generation, reduce grid reliance and maximise the value of an existing solar investment.
Outcome: Reduced grid electricity consumption by around 50% while storing surplus solar energy for use overnight, improving energy efficiency and lowering operating costs.
AUSTRALIAN ENGINEERING
When the project gets complicated, Dingo gets to work.
Grid constraint
Add energy capacity without waiting years for a larger grid connection.
Backup power
Keep critical loads running when the grid goes down.
Hybrid systems
Bring solar, batteries, generators and the grid together in one coordinated system.
Off-grid
Deliver reliable power where the grid doesn’t exist, or isn’t reliable enough.
SCALABLE & MODULAR
The right building block for the job.
Every project has different energy requirements, which is why Dingo is available with inverter capacity options of 29.9 kW, 50 kW, 100 kW, 150 kW and 200 kW.
From large homes, farms and small commercial sites through to high-demand commercial applications, you can select the right power capacity for the job and scale as your customer’s needs grow.
Equipped with built-in solar MPPTs, generator integration and the ability to operate on or off grid, Dingo brings generation, storage and power management together in one flexible platform.
Multiple Dingo systems can also be connected in parallel, providing a scalable solution for larger applications. The result is less integration, fewer moving parts and a system designed around the realities of Australian energy projects.
Need something scalable?
The Dingo system offers a range of configuration options based on your requirements.
This ensures you have the best option for your needs, and also leaves room for scalability as your business expands.
Build your Dingo pack 🐕
Option 1. 29.9kW up to 360kWh (large residential size <30kW)
Single 29.9kW inverter can support up to six battery cabinets
Option 2. 50kW up to 360kWh (parallel 50kW/60kWh Dingoes)
Single 50kW inverter can support up to six battery cabinets
Option 3. Up to 10 x Option 2 in parallel
Up to 10 x 50kW inverters can be connected in parallel, each with at least 1 x 60kWh battery cabinets
Need something scalable?
The Dingo system offers a range of configuration options based on your requirements.
This ensures you have the best option for your needs, and also leaves room for scalability as your business expands.
Build your Dingo pack 🐕
Option 1. 29.9kW up to 360kWh (large residential size <30kW)
Single 29.9kW inverter can support up to six battery cabinets
Option 2. 50kW up to 360kWh (parallel 50kW/60kWh Dingoes)
Single 50kW inverter can support up to six battery cabinets
Option 3. Up to 10 x Option 2 in parallel
Up to 10 x 50kW inverters can be connected in parallel, each with at least 1 x 60kWh battery cabinets
CASE STUDY
How Tatiara Trucks cut energy costs by 80% without a grid upgrade.
Project Snapshot
Project: Tatiara Trucks & Trailers commercial workshop, Bordertown, South Australia
Installer: Bordertown Pumps
System: 100kW / 240kWh RedEarth Dingo commercial battery energy storage system (BESS), integrated with rooftop solar and backup generation
Commissioned: 2025
Challenge: Rising electricity costs, limited 200A grid capacity, and the high cost of a grid upgrade were restricting business growth and energy resilience.
Outcome: Reduced annual energy costs by approximately 80%, increased available site capacity from 200A to 340A, avoided a costly grid upgrade and around $20,000 per year in demand charges, while providing reliable backup power for uninterrupted operations.
✔ 80% reduction in annual energy costs
✔ Avoided costly grid upgrade
✔ 340A available site capacity
✔ $20,000/year demand charges avoided
✔ 100kW / 240kWh commercial BESS
Need a complete solution?
No worries. RedEarth has a full range of certified support services and components available for your install.
We want your installation and ongoing operation to be as easy and reliable as possible. Depending on your requirements and system, RedEarth currently offers a range of optional extras, including support services and compatible hardware components, with more being added all the time. So no matter whether you are on-grid or off-grid, RedEarth is the perfect solution.
Support services
- Single line diagram service
- Engineering support service
- Generator compatibility support service
- PV array design support service
- Satellite Starlink (local WiFi service)
- Factory/onsite support and training
- RedEarth remote monitoring service
- RedEarth's Enterprise Power Plant (EPP)
RedEarth-certified components
- AC Switchboard to combine Dingoes
- Network Protection Board
- EV Fast Charger 25+kW (EPP compatible)
Need a custom-built package?
No worries. Chat with us about our custom containerised options.
Need a complete solution?
No worries. RedEarth has a full range of certified support services and components available for your install.
We want your installation and ongoing operation to be as easy and reliable as possible. Depending on your requirements and system, RedEarth currently offers a range of optional extras, including support services and compatible hardware components, with more being added all the time. So no matter whether you are on-grid or off-grid, RedEarth is the perfect solution.
Support services
- Single line diagram service
- Engineering support service
- Generator compatibility support service
- PV array design support service
- Satellite Starlink (local WiFi service)
- Factory/onsite support and training
- RedEarth remote monitoring service
- RedEarth's Enterprise Power Plant (EPP)
RedEarth-certified components
- AC Switchboard to combine Dingoes
- Network Protection Board
- EV Fast Charger 25+kW (EPP compatible)
Need a custom-built package?
No worries. Chat with us about our custom containerised options.
